Reliable Site Power for the Rumah 2 1,774.8 MW IPP | KAYADA
2026-09-11KAYADA Supports Reliable Site Power for the Rumah 2 1,774.8 MW Independent Power Project
As participation at the Rumah 2 1,774.8 MW Independent Power Project continues to grow, electricity demand in the site accommodation facilities is also increasing.
To support the project’s growing need for dependable power, Tianjin Electric Power Construction (TEPC) selected a generator-set solution from KAYADA for the site living area.
During delivery, the generator set was unloaded at the project site and prepared to support continuous electricity supply for daily accommodation needs. The solution was configured through the generator controller to enable:
Automatic generator starting when power is required
Automatic load acceptance after startup
Scheduled load unloading
Automatic shutdown at the configured time
Reduced reliance on continuous manual operation
By integrating the operating schedule into the controller settings, the generator set can support a more efficient and reliable power-management process for the site accommodation facilities.


For construction and power-infrastructure projects, dependable temporary power is essential for maintaining safe, comfortable and efficient site operations. From equipment delivery to control configuration, KAYADA provides practical generator-set solutions tailored to the real operating requirements of project sites.
Project Summary
Project: Rumah 2 1,774.8 MW Independent Power Project
Customer: Tianjin Electric Power Construction (TEPC)
Application: Site accommodation power supply
Control Functions: Automatic start, load acceptance, timed unloading and shutdown
For reliable generator-set solutions for project sites, contact KAYADA.